Bringing The World Home To You

© 2024 WUNC North Carolina Public Radio
120 Friday Center Dr
Chapel Hill, NC 27517
919.445.9150 | 800.962.9862
91.5 Chapel Hill 88.9 Manteo 90.9 Rocky Mount 91.1 Welcome 91.9 Fayetteville 90.5 Buxton 94.1 Lumberton 99.9 Southern Pines 89.9 Chadbourn
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Controversial Bridge Could Get Fast-Tracked

mid-currituck bridge
NC DOT

A controversial bridge project that would make the northern Outer Banks more accessible could happen earlier than expected.

The Mid-Currituck Bridge has been on the drawing board for years. The seven-mile bridge would cross the Currituck sound and link Corolla to the mainland.

The State Department of Transportation heard a proposal for a quicker timeline for bridge construction earlier this month. Gov. Pat McCrory outlined the fast-tracking of the project in November.

The current cost estimate for the bridge is $410 million. It would be funded, in part, by tolls.

Environmental groups say the bridge is unnecessary and the ecological impacts are unknown.

If approved, construction could start in 2019 and run through 2025.

Dave DeWitt is WUNC's Supervising Editor for Politics and Education. As an editor, reporter, and producer he's covered politics, environment, education, sports, and a wide range of other topics.
More Stories